NOTICE DATE: November 6,
2010
NOTICE TYPE: M-A110610-01
CRR
SHORT DESCRIPTION:
Differences between CRR network models posted on October 26, 2010, and November
5, 2010
INTENDED AUDIENCE: CRR
Account Holders
DAY AFFECTED: November 5,
2010, CRR network model posting
LONG DESCRIPTION: There
are differences between the CRR network model posted on October 26, 2010, and
the CRR network model posted on November 5, 2010. The differences fall in the
following categories:
Outages: Many of the outages that were used in
building the model posted on October 26, 2010, were cancelled prior to building
the model posted on November 5, 2010. Two more outages were considered. The
differences are detailed on a file titled “OutagesDifferences.xlsx”
and posted in the operator messages section of the CRR application.
Buses: Buses that are generated due to splits
are assigned arbitrary 90XXXX bus numbers by the topology processor. These
change from one model to the next.
Contingencies: There are many differences in
contingencies between the two files. These differences are detailed in the file
titled “Contingency Differences.xlsx” and posted in the operator
messages section of the CRR application.
Transformers: There were several transformers
that were incorrectly not included in the model posted on October 26, 2010, due
to the fact that they had identical High bus/Low bus/Circuit IDs. The Circuit
IDs were updated to stop this from occurring. These and other reasons for
transformers are detailed in the file titled “Transformer
Differences.docx” and posted in the operator messages section of the CRR
application.
Branches: There were several branches that were
incorrectly not included in the model posted on October 26, 2010, due to the fact
that they had identical from bus/to bus/Circuit IDs. The Circuit IDs were
updated to stop this from occurring. These are detailed in the file titled
“Branches with identical from-to-cktid.xlsx” and posted in the
operator messages section of the CRR application. Other branch differences are
due to flipping of the from/to bus order, the differences in bus numbers, as
mentioned above, or outages.
ADDITIONAL INFORMATION: ***Reminder
of December 2010 CRR Auction Activity Deadlines*** Credit Submission for the
December 2010 Monthly Auction will close at 17:00:00 CPT on Monday, November 8,
2010.
Per Section 7.5.2 (3) of the ERCOT Nodal Protocols, ERCOT
will enforce a volume limitation of 10,000 market transactions (bids and
offers) per account holder. The CRR Auction Bid window opens at 00:00:01
CPT on November 9, 2010, and closes at 17:00:00 CPT on November 11, 2010.
Per NP 7.5.2 (3)(c), if the total number of bids submitted
for the auction exceeds 200,000, a second round of bid submissions will be
required. CRR Account Holders will be notified via Operator Message. Account
Holders whose bids and offers exceed the maximum number of allowable
bids/offers determined for the second round will have their portfolios removed
from the auction and will be required to resubmit a new portfolio with the
total number of bids less than or equal to the second round bid limit. The
current bid/offer limit for the second round of the December 2010 Monthly
Auction is set at 1814. Note that this limit is subject to change prior to the
running of the auction. The final maximum allowable bids/offers will be listed
in the Operator Message should a second auction be necessary.
This second auction, if needed, will be open from 18:00:00
CPT on November 11, 2010, until 12:00:00 CPT on November 12, 2010.
The Baseload CRRs used for the December 2010 Monthly Auction
may be found in the Monthly Auction Notice folder on the CRR Market Information
System (MIS) site at https://mis.ercot.com/pps/tibco/mis/Pages/Market+Information/CRR.
Specifications for the equipment and interfaces necessary to participate in the
CRR Auction are included in the CRR Market User Interface Specifications
document, which may also be found on the MIS.
Note that all future CRR Auction Notices will be posted
on MIS and will not be distributed by ERCOT as a standard Market Notice. CRR
Account Holders should verify that they can access the MIS to view these
notices.
The ERCOT Board-approved values for A and M as referenced in
Nodal Protocols Section 7.5.5.3 (1) (a) (iii) are currently set at $.75/MWh and
0 respectively.
CONTACT: If you have any
questions, please contact your ERCOT Account Manager. You may also call the
general ERCOT Client Services phone number at (512) 248-3900 or contact the
ERCOT CRR Team via email at [log in to unmask].
If you
are receiving email from an ERCOT distribution list that you no longer wish to
receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com.
dh