NOTICE DATE: November 30,
2010
NOTICE TYPE: M-C113010-01
Operations
SHORT DESCRIPTION:
Centerville Switch SPS status revision
INTENDED AUDIENCE: ERCOT
Market Participants
DAY AFFECTED: November
30, 2010
LONG DESCRIPTION: ERCOT
has received a request to revise the Special Protection System (SPS)
designation for the Oncor Centerville Switch (Oncor SPS #27). Oncor has
requested that the two line reactors at Centerville Switch which are currently
in-service in manual mode be designated as the permanent operating state for
this site; thereby removing the SPS designation for this configuration.
ERCOT has vetted the proposal
and finds that because the reactors are normally in-service the configuration
is no longer acting as an SPS. Based on this review, ERCOT recommends that the
SPS designation for this transmission configuration be removed and the reactors
at Centerville Switch remain in-service in manual mode.
Further details on SPSs can be found in the “Special
Protection Systems Information” section of the ERCOT Planning and
Operations Information secure website: http://planning.ercot.com/login/login.
CONTACT:
If you have any questions, please contact your ERCOT Account Manager. You may
also call the general ERCOT Client Services phone number at (512) 248-3900 or
contact ERCOT Client Services via email at [log in to unmask].
If you
are receiving email from an ERCOT distribution list that you no longer wish to
receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com.
dh