NOTICE DATE: July 30, 2012
NOTICE TYPE: M-A073012-01 NPRR
SHORT DESCRIPTION: Implementation details for NPRR348
INTENDED AUDIENCE: QSEs
DAYS AFFECTED:
August 29, 2012
LONG DESCRIPTION: ERCOT is implementing settlement and performance reporting changes for Nodal Protocol Revision Request (NPRR)
348, Generation resource start-up and shut-down process, which was approved by the ERCOT Board on September 20, 2011. These changes have a planned production migration date of August 29, 2012 and will take effect on that same operating day.
NP8-501-ER
Monthly Resource Energy Deployment Performance Report will be affected by the implementation of this NPRR. There will be no changes to the structure or format of the report, but the underlying calculations have been adjusted to comply with the protocol
changes in section 8.1.1.4.1 of NPRR 348. These changes will be effective with the September posting for the August data.
Settlement impacts include addition of new flags and changes to existing flags which are noted below:
1.
New exemption flag indicating the Resource has met the following conditions for either Start-Up or Shut-Down (SUSDFLAG)
·
Anytime a Resource sends telemetry to ERCOT with a status of “STARTUP” during the 15-minute Settlement Interval.
·
Anytime a Resource’s Adjusted Aggregated Base Point (AABP) is less than the average telemetered Low Sustained Limit (LSL).
2.
Replace the telemetered High Sustained Limit flag (TELHSLFLAG) with two separate exemption flags to provide market transparency for shadow settlements.
·
STATUSONTEST - Resource Status of ONTEST to indicate in the Current Operating Plan (COP) and through telemetry that the Generation Resource is performing a test of its operations
either manually dispatched by the Qualified Scheduling Entity (QSE) or by ERCOT as part of the test for the 15-minute Settlement Interval.
·
QSFLAG - For Quick Start Generation Resources (QSGRs) during the 15-minute Settlement Interval(s) that includes any part of the first ten minutes after the start
of the first Security-Constrained Economic Dispatch (SCED) interval in which the QSGR is deployed.
ACTION REQUIRED: Implement changes to shadow settlement systems in compliance with NPRR348.
ADDITIONAL INFORMATION:
New Settlement Bill Determinants:
The following new bill determinants will be implemented for NPRR348:
Bill Determinant |
Short Description |
Extract |
Extract Table |
AVGTLSL |
Average Telemetered Low Sustained Limit |
RTM CODE |
RTMOUTPUTHEADER RTMOUTPUTINTERVAL |
STATUSSTARTUP |
Indicates the Telemetered resource status of Start-Up has been submitted to ERCOT |
SID RTM CODE |
MKTINPUTHEADER MKTINPUTINTERVAL |
SUSDFLAG |
Indicates the Resource has met the conditions for start-up or shut-down exemption |
RTM CODE |
RTMOUTPUTHEADER RTMOUTPUTINTERVAL |
STATUSONTEST |
Indicates the Telemetered resource status of ONTEST has been submitted to ERCOT |
SID RTM CODE |
MKTINPUTHEADER MKTINPUTINTERVAL |
QSFLAG |
For QSGRs, during the 15-minute Settlement Interval(s) that includes any part of the first ten minutes after the start of the first
SCED interval in which the QSGR is deployed. |
SID RTM CODE |
MKTINPUTHEADER MKTINPUTINTERVAL |
CONTACT: If you have any questions, please contact your ERCOT Account Manager. You may also call the general ERCOT Client Services
phone number at (512) 248-3900 or contact ERCOT Client Services via email at
[log in to unmask].