NOTICE DATE:  September 17, 2015    

NOTICE TYPE:  W-A091715-01 Operations

SHORT DESCRIPTION:  Annual Stability limit and IROL communication

INTENDED AUDIENCE:  Transmission Owners, Generation Owners, Transmission Operators, Generator Operators, Transmission Planners

DAY AFFECTED:  September 17, 2015

LONG DESCRIPTION:  ERCOT reviewed operating limits for 2015 that are stability limits and or that meet the criteria of an Interconnection Reliability Operating Limit (IROL) in accordance with the ERCOT System Operating Limit (SOL) Methodology for the Planning and Operations Horizon.

There are no stability related limits or IROLs that have been identified for the Planning Horizon based on studies completed in 2014.

There are 4 stability related limits that have been identified for the Operations Horizon which are represented by the following Generic Transmission Constraints (GTCs).

2015 GTCs/Non-IROL:

GTCs / Non-IROL

Affected ERCOT Transmission Operators

Valley Import

American Electric Power,

South Texas Electric Co-op,

Brownsville Public Utility Board,

Sharyland Utilities

Zorillo to Ajo

American Electric Power

Laredo

American Electric Power

Panhandle

American Electric Power,

ONCOR,

Wind Energy Transmission of Texas (WETT),

Cross Texas Transmission,


Sharyland Utilities

 

There is one Generic Transmission Constraint (GTC) that meets the criteria of an IROL for the Operations Horizon.

2015 GTC/IROLs:

GTC/IROL Name

Affected ERCOT Transmission Operators

North-Houston Voltage Stability Limit

CenterPoint Energy

 

If a GTC and or an IROL affects your facilities or operating area, ERCOT will be following up with additional details and coordination within the next 30 days.   ERCOT has not identified any other affected entities at the time of this communication.  Any new GTCs that are created due to necessity before the next annual review will be directly communicated to the affected entities.  For any IROL affected ERCOT Transmission Operators, please consider this as affirmative notice of your need to consider the IROL-related assets under your NERC Critical Infrastructure Protection (CIP) program. Please refer to CIP-002-5, Requirement R1 and Attachment 1, sections 2.6 and 2.9.

CONTACT:  If you have any questions, please contact your ERCOT Account Manager. You may also call the general ERCOT Client Services phone number at (512) 248-3900 or contact ERCOT Client Services via email at [log in to unmask].

If you are receiving email from an ERCOT distribution list that you no longer wish to receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com.

 

 

 

 

mm