PGDTF,
The materials for Pass 1 of the GIC Model Build have been posted to MIS. For this pass the expectation is that the substation and bus tables will be fully updated. The GIC Modeling Expectations has details on how to use the template if
those are needed.
Pass 1 End Date: 4/5/2019
Pass 1:
·
For Pass 1, the only submissions ERCOT should receive are modified GIC templates that are updating the Bus and Substation tables
·
In the Bus table, each bus must be associated with a substation
·
The substation table should be updated as needed
As a result of Pass 0, a set of solving GIC AC models have been created that incorporate all TSP submitted Idevs, all applicable off-cycle updates, and any generators that have met 6.9(2) of the Planning Guides that were fully modeled by
3/22/2019.
Please don’t hesitate reach out and call or email me if you have any questions on what should be updated, how to use the template, or you have any issues or questions.
Here is the overall schedule as a reminder.
Thanks,
Eric
|
Eric Meier Network Model Engineer 2 Network Model Administration 2705 West Lake Drive Taylor, Texas 76574 O: 512-248-6770 |