Hello Sandip and Nitika, In the meeting today, when I asked if all of the Non-Spin obligation was procured in the DAM, I was viewing the AS capacity monitor Non-Spin Reserve Capacity and Non-Spin Reserve Responsibility sections. It looks like the On Line Non-spin is not included in the capacity because it is already considered deployed so the schedule is zero. Is that correct? [cid:image002.jpg@01D77724.CCE90430] [cid:image006.jpg@01D77724.CCE90430] David Detelich ######################################################################## To unsubscribe from the WMWG list, click the following link: http://lists.ercot.com/scripts/wa-ERCOT.exe?SUBED1=WMWG&A=1