NOTICE DATE: October 9, 2023
NOTICE TYPE: M-A100923-01 Operations
SHORT DESCRIPTION: Replacement of missing data due to telemetry issues
INTENDED AUDIENCE: All Market Participants
DAYS AFFECTED: October 3, 2023 and October 4, 2023
LONG DESCRIPTION: On October 3 and 4, 2023, the four 5 -minute and one 15 -minute interval averages specified below were not calculated in one of the Energy Management System (EMS) applications due to telemetry issues associated with a new Resource. Telemetry issues occurred after the OCT_ML1 Model Load at 23:56 on October 3, 2023 resulting in certain data not being transferred to the settlement system. These telemetry issues were corrected at approximately 00:42 on October 4, 2023. The missing data was limited to data transferred to the settlement system and did not impact SCED Dispatch or prices.
To fill in the data gap for the missing 5 -minute and 15 -minute interval data, data from other intervals were copied into the missing intervals as follows:
Operating Day |
Missing Data |
Replacement Data Copied From |
10/3/2023 |
5-min interval 288 |
5-min interval 287 |
10/4/2023 |
5-min interval 1 |
5-min interval 2 |
10/4/2023 |
5-min interval 5 |
5-min interval 4 |
10/4/2023 |
5-min interval 7 |
5-min interval 6 |
10/4/2023 |
15-min interval 2 |
15-min interval 1 |
The impacted billing determinants for this issue are listed below:
Billing Determinant |
Description |
AABP |
Adjusted Aggregated Base Point |
ATPC |
Average Telemetered Power Consumption Controllable Load Resource |
AVGBP |
Average Basepoint |
AVGBP5M |
Average Basepoint 5 Min Clock Interval |
AVGREG |
Average Regulation Instruction |
AVGREG5M |
Average Regulation Instruction 5 Min Clock Interval |
AVGREGDN5M |
Average Regulation Dn Instruction 5 Min Clock Interval |
AVGREGUP5M |
Average Regulation Up Instruction 5 Min Clock Interval |
AVGTG5M |
Average Telemetered Generation 5 Min Clock Interval |
CLRASFLAG |
Controllable Load Resource A.S. Responsibility |
GSSPLITSCA |
Generation Splitting Scada |
RTASOFFR |
Real-Time Ancillary Service Schedule for the Off-Line Gen Resource |
RTCLRLPCR |
Real-Time Low Power Consumption Controllable Load Resource |
RTCLRNPCR |
Real-Time Net Power Consumption Controllable Load Resource |
RTCLRNSR |
Real-Time Non Spin Schedule for the Controllable Load Resource |
RTCLRNSRESPR |
Real-Time Non-Spin Responsibility for Controllable Load Resource |
RTCLRREGR |
Real-Time Controllable Load Resource Regulation-Up Schedule |
RTCST30HSL |
Real-Time Generation Resource with Cold Start Available in 30 Min |
RTNCLRECRSR |
RT Non-Controllable Load Resource ERCOT Contingency Reserve |
RTNCLRLPCR |
RT Non-Controllable Load Resource Low Power Consumption |
RTNCLRNPCR |
RT Non-Controllable Load Resource Net Power Consumption |
RTNCLRNSR |
RTM Non-Spin Schedule for Non-Controllable Load Resource |
RTNCLRNSRESPR |
RTM Non-Controllable Load Resource Non-Spin Resp. by Resource |
RTNCLRRRSR |
Real-Time Non-Controllable Load Res Responsive Reserve Sched |
RTOFFNSHSL |
Real-Time Generation Resources with Offline Non-Spin Schedule |
RTOLHSLR |
Real-Time On-Line High Sustained Limit for the Resource |
TGFTH |
Telemetered Generation |
TLSL |
Telemetered LSL |
TWTG |
Time-Weighted Telemetered Generation |
CONTACT: If you have any questions, please contact your ERCOT Account Manager. You may also call the general ERCOT Client Services phone number at (512) 248-3900 or contact ERCOT Client Services via email at [log in to unmask].