NOTICE_OPERATIONS Archives

Notice_Operations

NOTICE_OPERATIONS@LISTS.ERCOT.COM

Options: Use Forum View

Use Monospaced Font
Show HTML Part by Default
Condense Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Message-ID:
Sender:
Notice_Operations <[log in to unmask]>
Subject:
From:
ERCOT Client Relations <[log in to unmask]>
Date:
Thu, 11 Nov 2010 17:51:02 -0600
MIME-Version:
1.0
Content-Type:
multipart/alternative; boundary="_000_4AD642AC2C766D4C9A298143222B4E9B24D22C9C48TMBXSERVER1er_"
Comments:
cc: 1 ERCOT Client Service Reps <[log in to unmask]>, 1 Network Data Support WG <[log in to unmask]>, "[log in to unmask]" <[log in to unmask]>
Parts/Attachments:
text/plain (2945 bytes) , text/html (12 kB)
NOTICE DATE:  November 11, 2010

NOTICE TYPE:  M-A102710-02 Operations

SHORT DESCRIPTION:  REMINDER - TSPs to submit their equipment rating methodologies before November 15, 2010

INTENDED AUDIENCE:  Transmission Service Providers (TSPs)

DAY AFFECTED:  Ratings to be submitted before November 15, 2010
LONG DESCRIPTION:  This Notice is a reminder for TSPs to submit their rating methodologies, in accordance with Nodal Protocol Section 3.10 (3), before November 15, 2010, to be posted to the Market Information System (MIS) for Nodal Go-Live. All methodologies will be posted under the TSP Rating Methodology link at https://mis.ercot.com/pps/tibco/mis/Pages/Grid+Information/Long+Term+Planning.
ACTION REQUIRED:  If you have not already done so, TSPs shall submit any needed equipment rating methodologies as an attachment to a Special Action Model Request (SAMR) into the Network Model Management System (NMMS). The naming convention for the SAMR should be "TSPNAME Rating Methodology xx/xx/2010."
ADDITIONAL INFORMATION:  TSPs are also required to provide future updates to their methodology documents if those methodologies change. The process for updating the documents will be the same as the initial posting. The updated document should be attached to a SAMR and submitted to ERCOT. ERCOT will post the updated documents within seven days of receipt. Updates to the rating methodology documents are necessary only if the document changes or if ERCOT requests more detailed information.
The following Protocol section is provided for reference:

3.10       Network Operations Modeling and Telemetry

(3)       TSPs and Resource Entities shall provide ERCOT with equipment ratings and update the ratings as required by ERCOT. ERCOT shall post all equipment ratings on the Market Information System (MIS) Secure Area no later than the day prior to the ratings becoming effective including the identity of the Transmission Element, old rating and new rating, effective date, and a text reason supplied by the appropriate TSPs and Resource Entities for the rating change. ERCOT may request TSPs and Resource Entities to provide detailed information on the methodology, including data for determination of each requested rating. ERCOT may review and comment on the methodology. ERCOT shall post all methodologies on the MIS Secure Area within seven days following a change in methodology.

CONTACT:  If you have any questions, please contact [log in to unmask]<mailto:[log in to unmask]> or your ERCOT Account Manager. You may also call the general ERCOT Client Services phone number at (512) 248-3900 or contact ERCOT Client Relations via email at [log in to unmask]<blocked::mailto:[log in to unmask]>.
If you are receiving email from an ERCOT distribution list that you no longer wish to receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com<http://lists.ercot.com/>.



dh



ATOM RSS1 RSS2