NOTICE_SETTLEMENTS Archives

Notice_Settlements

NOTICE_SETTLEMENTS@LISTS.ERCOT.COM

Options: Use Forum View

Use Monospaced Font
Show HTML Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
ERCOT Client Services <[log in to unmask]>
Date:
Fri, 17 Aug 2012 16:13:51 +0000
Content-Type:
multipart/alternative
Parts/Attachments:
text/plain (3701 bytes) , text/html (24 kB)
NOTICE DATE:  August 17, 2012
NOTICE TYPE:  M-A073012-02 NPRR
SHORT DESCRIPTION:  REMINDER - Implementation details for NPRR348
INTENDED AUDIENCE:  QSEs
DAY AFFECTED:  August 29, 2012
LONG DESCRIPTION:  ERCOT is implementing settlement and performance reporting changes for Nodal Protocol Revision Request (NPRR) 348, Generation Resource Start-Up and Shut-Down process, which was approved by the ERCOT Board on September 20, 2011. These changes have a planned production migration date of August 29, 2012, and will take effect on that same Operating Day.
The Monthly Resource Energy Deployment Performance Report (NP8-501-ER) will be affected by the implementation of this NPRR. There will be no changes to the structure or format of the report, but the underlying calculations have been adjusted to comply with the changes in Protocol Section 8.1.1.4.1, Regulation Service and Generation Resource/Controllable Load Resource Energy Deployment Performance. These changes will be effective with the September posting for the August data.
Settlement impacts include the addition of new flags and changes to existing flags which are noted below:

1.    New exemption flag indicating the Resource has met the following conditions for either Start-Up or Shut-Down (SUSDFLAG)

*         Anytime a Resource sends telemetry to ERCOT with a status of "STARTUP" during the 15-minute Settlement Interval

*         Anytime a Resource's Adjusted Aggregated Base Point (AABP) is less than the average telemetered Low Sustained Limit (LSL)

2.    Replace the telemetered High Sustained Limit flag (TELHSLFLAG) with two separate exemption flags to provide market transparency for shadow settlements

*         STATUSONTEST - Resource Status of ONTEST to indicate in the Current Operating Plan (COP) and through telemetry that the Generation Resource is performing a test of its operations, either manually dispatched by the Qualified Scheduling Entity (QSE) or by ERCOT as part of the test for the 15-minute Settlement Interval

*         QSFLAG - For Quick Start Generation Resources (QSGRs) during the 15-minute Settlement Interval(s) that includes any part of the first ten minutes after the start of the first Security-Constrained Economic Dispatch (SCED) interval in which the QSGR is deployed
ACTION REQUIRED:  Implement changes to shadow settlement systems in compliance with NPRR348.
ADDITIONAL INFORMATION:  The following new Settlement Bill Determinants will be implemented for NPRR348:

Bill Determinant


Short Description


Extract


Extract Table


AVGTLSL


Average Telemetered Low Sustained Limit


RTM CODE


RTMOUTPUTHEADER

RTMOUTPUTINTERVAL


STATUSSTARTUP


Indicates the Telemetered Resource status of Start-Up has been submitted to ERCOT


SID

RTM CODE


MKTINPUTHEADER

MKTINPUTINTERVAL


SUSDFLAG


Indicates the Resource has met the conditions for Start-Up or Shut-Down exemption


RTM CODE


RTMOUTPUTHEADER

RTMOUTPUTINTERVAL


STATUSONTEST


Indicates the Telemetered Resource status of ONTEST has been submitted to ERCOT


SID

RTM CODE


MKTINPUTHEADER

MKTINPUTINTERVAL


QSFLAG


For QSGRs, during the 15-minute Settlement Interval(s) that includes any part of the first ten minutes after the start of the first SCED interval in which the QSGR is deployed


SID

RTM CODE


MKTINPUTHEADER

MKTINPUTINTERVAL


CONTACT:  If you have any questions, please contact your ERCOT Account Manager. You may also call the general ERCOT Client Services phone number at (512) 248-3900 or contact ERCOT Client Services via email at [log in to unmask]<mailto:[log in to unmask]>.
If you are receiving email from an ERCOT distribution list that you no longer wish to receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com.




dh



ATOM RSS1 RSS2