NOTICE_SETTLEMENTS Archives

Notice_Settlements

NOTICE_SETTLEMENTS@LISTS.ERCOT.COM

Options: Use Forum View

Use Monospaced Font
Show HTML Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
ERCOT Client Services <[log in to unmask]>
Date:
Mon, 30 Jul 2012 20:53:47 +0000
Content-Type:
multipart/alternative
Parts/Attachments:
text/plain (3641 bytes) , text/html (24 kB)
NOTICE DATE:  July 30, 2012

NOTICE TYPE:  M-A073012-01 NPRR

SHORT DESCRIPTION:  Implementation details for NPRR348

INTENDED AUDIENCE:  QSEs

DAYS AFFECTED:  August 29, 2012

LONG DESCRIPTION:  ERCOT is implementing settlement and performance reporting changes for Nodal Protocol Revision Request (NPRR) 348, Generation resource start-up and shut-down process, which was approved by the ERCOT Board on September 20, 2011. These changes have a planned production migration date of August 29, 2012 and will take effect on that same operating day.

NP8-501-ER Monthly Resource Energy Deployment Performance Report will be affected by the implementation of this NPRR. There will be no changes to the structure or format of the report, but the underlying calculations have been adjusted to comply with the protocol changes in section 8.1.1.4.1 of NPRR 348. These changes will be effective with the September posting for the August data.

Settlement impacts include addition of new flags and changes to existing flags which are noted below:

1.    New exemption flag indicating the Resource has met the following conditions for either Start-Up or Shut-Down (SUSDFLAG)

*         Anytime a Resource sends telemetry to ERCOT with a status of "STARTUP" during the 15-minute Settlement Interval.

*         Anytime a Resource's Adjusted Aggregated Base Point (AABP) is less than the average telemetered Low Sustained Limit (LSL).

2.    Replace the telemetered High Sustained Limit flag (TELHSLFLAG) with two separate exemption flags to provide market    transparency for shadow settlements.

*         STATUSONTEST - Resource Status of ONTEST to indicate in the Current Operating Plan (COP) and through telemetry that the Generation Resource is performing a test of its operations either manually dispatched by the Qualified Scheduling Entity (QSE) or by ERCOT as part of the test for the 15-minute Settlement Interval.

*         QSFLAG - For Quick Start Generation Resources (QSGRs) during the 15-minute Settlement Interval(s) that includes any part of the first ten minutes after the start of the first Security-Constrained Economic Dispatch (SCED) interval in which the QSGR is deployed.



ACTION REQUIRED:  Implement changes to shadow settlement systems in compliance with NPRR348.

ADDITIONAL INFORMATION:

New Settlement Bill Determinants:

The following new bill determinants will be implemented for NPRR348:

Bill Determinant

Short Description

Extract

Extract Table

AVGTLSL

Average Telemetered Low Sustained Limit

RTM CODE

RTMOUTPUTHEADER

RTMOUTPUTINTERVAL

STATUSSTARTUP

Indicates the Telemetered resource status of Start-Up has been submitted to ERCOT

SID

RTM CODE

MKTINPUTHEADER

MKTINPUTINTERVAL

SUSDFLAG

Indicates the Resource has met the conditions for start-up or shut-down exemption

RTM CODE

RTMOUTPUTHEADER

RTMOUTPUTINTERVAL

STATUSONTEST

Indicates the Telemetered resource status of ONTEST has been submitted to ERCOT

SID

RTM CODE

MKTINPUTHEADER

MKTINPUTINTERVAL

QSFLAG

For QSGRs, during the 15-minute Settlement Interval(s) that includes any part of the first ten minutes after the start of the first SCED interval in which the QSGR is deployed.

SID

RTM CODE

MKTINPUTHEADER

MKTINPUTINTERVAL



CONTACT:  If you have any questions, please contact your ERCOT Account Manager. You may also call the general ERCOT Client Services phone number at (512) 248-3900 or contact ERCOT Client Services via email at [log in to unmask]<mailto:[log in to unmask]>.

If you are receiving email from an ERCOT distribution list that you no longer wish to receive, please follow this link in order to unsubscribe from this list: http://lists.ercot.com<http://lists.ercot.com/>.







rws



ATOM RSS1 RSS2